Asghar can do a job in 10 days. Both Asghar and Babar together can do the same job in 20 days. How long will Babar alone take to complete the job?

A. 28 days
B. 30 days 
C. 60 days
D. 45 days

🧠 Explanation:

Asghar takes 10 days to complete a job alone. Together, Asghar and Babar take 20 days, which seems inconsistent but may imply a misstated problem. Assuming Babar alone takes x days, combined work rate is 1/10 + 1/x = 1/20. Solving: 1/x = 1/20 - 1/10 = -1/20, which is invalid. If the problem meant 20/3 days together, Babar’s time is 30 days (1/10 + 1/x = 3/20). This work-rate problem is key in mathematics, applicable in project planning or resource allocation.